The Real Estate team records the conveyance document when the mylars and the 584 form are approved. You can apply for a water main permit after your utility public plan set are approved by the Office of City Engineer (OCE). You can apply for an unmetered fire line after your building plans are approved by Utility Review in Taps & Meters. A transient water meter service is a “temporary” meter typically installed on a publicly-owned fire hydrant. After Taps & Meters approves your sanitary tap application it is completed by a Taps and Meters Customer Service Representative (CSR). Registered users can submit initial applications, project documents, submit revisions, correction, view permits, and make payments online. At this time in-person applications will not be accepted. You will need to have all the required documents outlined in the procedures depending on your use. Houston Public Works Water Resource team manages Houston Water contracts, regulatory support and the review of water district creations & annexations. All accounts previously serviced by our third party operator, Inframark LLC, were merged into the City's existing solid waste utility accounts. Plan and profile of water and sewer connections. You will need to have all the required documents outlined in the procedures depending on your use. Clear Lake Water Authority letter: this is only needed if it is stated on your WCR Letter. Locations outside of City limits that apply for large meters will need an OCL Plumbing permit from Plumbing Inspections section located on the 4th floor of the Houston Permitting Center. It is common for the utility contractor working on the project to coordinate the approval of the meter easement process as it is ultimately tied to the release and installation of the meter itself. Water meters and/or back flow prevention devices frozen as a result of the meter box being removed, will also result in a replacement fee. We are unable to update existing accounts at the Houston Permitting Center. Building Inspections & Permits 300 W. Davis Conroe, Texas 77301 Business Hours Monday- Thursday 7:30am-5pm Friday 8am-4:30pm Phone: 936.522.3610 Houston City Council has adopted an ordinance extending existing untreated water supply contracts for up to a year provided an Application for Untreated Water is received by December 31, 2020. If you have any questions please contact us by email: publicworks.webmaster@houstontx.gov. In addition to being able to access these forms from each respective department and online content area, you can find and access all necessary forms, applications and attachments applicable to conducting business with The City of Houston … Validation form: this document is validated by, Common area agreement (customer contract): this is validated by Infrastructure and given back to the customer to upload with their plans.>. In-City MUD Bonds - watercontracts@houstontx.gov, Utility District Review - mudreview@houstontx.gov  |  832.395.3087, Annexations, Creations of Management Districts - Houston Planning Department, pd.publicpolicy@houstontx.gov  |  832.393.6582, COH Home | 311 Helpline | Contact Us | FAQs | Privacy Policy | CitizensNet |  Houston Permitting Center | ReBuild Houston, 2020 Water District Consent Application Form, Reference Documents - In-City Consent Conditions, Reference Documents - Equivalent Service Units (ESU) Chart, Reference Documents - Extra-territorial Jurisdiction (ETJ) Consent Conditions, Untreated Water Supply Contract Public Comments Summary & Response, letter to the Director of Houston Public Works requesting approval of a Bond Sale, TCEQ’s Draft Order Authorizing the Issuance of Bonds, Draft Preliminary Official Statement & Notice of Sale, Draft Resolution Authorizing the Issuance of Bonds, Certificate provided by Harris County Appraisal District. The single-family residence cannot exceed 3,000 square feet or one service unit. Any person desiring to set a meter and or tap to City of Houston water and sanitary sewer mains within the corporate limits of the city. Primarily, the department is responsible for all the things we take for granted on a daily basis: the administration, planning, maintenance, construction management and technical engineering of the City’s infrastructure. A water main abandonment is the removal of an existing public water main located in the City of Houston Right-of-Way or public utility easement. The City of Eustis Water Department's goal is to operate its water production and distribution systems in the most efficient manner possible. A water main offset is vertical relocation of a portion of an existing public water main located in the City of Houston Right-of-way or public utility easement. . You can apply for a transient meter with the Utilities Customer Service Group by email at [email protected]. The plans must show your proposed sewer main extension or sewer main abandonment. The CSR is responsible for issuing the invoice for your permit and sending your work order to the Office of the City Engineer's Construction Services section. If you have any questions please contact publicworks.webmaster@houstontx.gov . You will need to have all the required documents outlined in the procedures depending on your use. These may service a permanent structure that can be use for multi-family, commercial, or government. The documents listed below are most commonly uploaded for utility review. Please see procedures to reference the documents needed for your use. Customer Account Services issues invoices for your large water meter permit, and sets up new water accounts. In the case of a water or sewer extension, the plan and profiles must be approved by the Office of the City Engineer. The replacement fee costs are as follows: New Service - $725.00 ($650.00 Tap Fee; $75.00 Connection Fee) Water Meter - $200.00; Water Meter Box - $50.00; Water Meter Box Lid - $25.00 If the initial purchase price exceeds this amount, the property owner making the certification shall pay the full amount of impact fees as calculated by Impact Fee Administration, located on the 3rd floor of the Houston Permitting Center. The following required documents must be uploaded into the Utility Letters folder: Small domestic water meters are any size meter that is 2” and smaller that may service a permanent structure that can be for residential, multi-family, commercial, or government use. This item may be accepted during or after the permitting process for utilities with the Taps & Meters group. You can apply for Sewer permits with the Taps & Meters section by email at [email protected]. The attached Wastewater Capacity Reservation Application (also used to obtain water and storm letters) must be completed by the current property owner or by an authorized representative of the owner. Cut, plug and abandon of a small meter (2" or less), Cut, plug and abandon an unmetered fire line, these letters are used for change of use for retail and are issued by, . There are different requirements and documents that will need to be provided based on project classification. Cut, Plug, and Abandon of an Unmetered Fire Line. Please see procedures to reference the documents needed for your use. The Taps & Meters section reviews residential and commercial plans for compliance with the WCR Letters, reviews impact fee exemptions, permits water meters and sewer connections, permits water and sewer main extensions, and permits water and sewer abandonments. During this process: A sponsor change is the process of updating or changing the utility contractor that has been selected to perform the installation of your public utilities. The city must have unlimited access to the meter and service (from water main to the meter). Other requirements include an approved public plan set from the Office of the City Engineer. Learn about City of Houston, TX culture, salaries, benefits, … If any corrections are needed regarding the requested easement, an email will be sent to the contact agents listed on the Large Job Information Sheet. . HHF Online Application; HHF Appeals Process (updated 01.14.2016) Small Business Resources. (Sewer main abandon, Sewer main extension). You can submit your large job application and required documents to [email protected]. A water meter easement is required for meters that are 3 inches or larger. and the horizontal and vertical distances. Get And Sign City Of Houston Water Leak Adjustment Form 2010-2020 . Please refer to the Airport Compatible Land Use Ordinance associated with runways at Intercontinental Airport-Houston. The CSR is responsible for issuing the invoice for your large water main permit and sending your work order to the Office of the City Engineer's Construction Services section. Dallas, Texas 75203 Phone: 214-948-4480 An inspection will be required prior to receiving water service to ensure the private water service line from each building or unit is connected to the meter designed to serve it. After Taps & Meters approves your large job application it is completed by a Taps and Meters Customer Service Representative (CSR). Tap to direct to exiting main or tap to a manhole. Note: Please read Large Meter Procedures in order to submit the required documents for your large meter request. Example: I have a 5/8” meter and I would like to enlarge to a 1” meter. You can submit your large meter application and required documents to [email protected]. You will need to have all the required documents outlined in the procedures depending on your use. A Meter easement cannot be submitted without first obtaining a Job number. The owner is responsible for turning in the closing statement for each impact fee exemption. Developer contract application fee, 81-90 lots: City Code Ch. Please push the Print button below. If any of the accounts associated with your permit are not in good standing, you will not be able to purchase your permit until the account issues are resolved. Fire Hydrant Relocation permits are required when an existing fire hydrant needs to be: You can apply for a water main permit after your utility public plan set are approved by the Office of City Engineer (OCE). Please allow 1-2 weeks from the date the request passed council. After Taps & Meters approves your large job application it is completed by Customer Account Services. As such, the City of Houston was one of the first to adopt Itron’s on-site billing solution in 1986, which streamlined the billing process by allowing meter readers to input consumption data and water service inspectors to print receipts, payment agreements, inspection notices and turn-off notices while still on site. When Taps & Meters approves your application, you will be given a Water New Service (WNS) number. Unusually Large Bill Adjustment Application City of Houston code of Ordinance, Section 47-75, allows a single-family residential customer … We will do our part to submit the information provided to us as quickly as possible and will update you as we receive updates from TxDOT. Please put "Large Job Request" in the subject line. CITY OF HOUSTON 1500 Marilla Street, Room 4A North Dallas, TX 75201. We are unable to update existing accounts at the Houston Permitting Center. If you have a construction or inspections issue or questions, you may contact the Construction Services at 832.394.9079. Residential water accounts are billed on a bi-monthly basis (every two months), and payment by the indicated due date is required to prevent interruption of service. This means we upload the information provided to us into TxDOT's online permit system, called the UIR. If any of the accounts associated with your permit are not in good standing, you will not be able to purchase your permit until the account issues are resolved. If you are sharing a meter with another unit and would like to install your own meter. A water meter easement may be required for meters that are 2 inches or smaller if the meter will be placed on private property. Easement Document Requirements: one of these options must be provided prior to set up of work order. In accordance with the Utility Functions and Services Allocations Agreement, the District must provide the Director with the Official Statement and Bond Resolution before the closing of the sale. You must have an approved TxDOT permit to apply for City of Houston permits if located in the right of way. Please put "Large Job Request" in the subject line. A non-refundable application fee of twenty dollars ($20) will be added to your first bill. At this time in-person applications will not be accepted. The plans must show your proposed sanitary sewer tap to the sewer main or manhole. TCEQ letter: required if your property is being served by a septic tank system, and this requirement will be listed on your WCR Letter. City of Houston. A water main offset is vertical relocation of a portion of an existing public water main located in the City of Houston Right-of-way or public utility easement. Please refer to the Large Meter Procedure link to obtain a Job number. Please put Large Job Request in the subject line. Note: Please refer to the Sponsor Change Form for detailed requirements. Small irrigation water meters are any size meter that is 2” and smaller that service a property for the purposes of landscape irrigation or for livestock only. You will need to have all the required documents outlined in the procedures depending on your use. A water meter easement is a small piece of land dedicated for a water meter, in which the City of Houston staff can access or install infrastructure. We do not control TxDOT's response time. We are unable to update existing accounts at the Houston Permitting Center. Under City Code, Houston Water offers contracts for the sale of untreated water for industrial, municipal, or agricultural use. CONTACT INFO. Once you pay your invoice, your plumber will receive a work order within 10-15 business days from Customer Account Services to set up an inspection with the Inspections group. If any part of the proposed land falls within a City of Houston airport height hazard restriction, a letter detailing the limited building height and the applicable tier designation will be mailed to the listed attorney. You will need to have all required documents outlined in procedures. You will need to have all the required documents outlined in procedures depending on your use. The call center can be reached at 713.371.1400. Must be drawn to scale and clearly show the right-of-way, distance from the utility line to the edge of the pavement, and any existing utility lines (water, sewer, storm, etc.) Bulk Water Usage. Installation of a Large Meter (3" and larger), Cut, plug and abandonment of a large meter (3" and larger). If you have a billing issue the CAS Call Center is your point of contact to update existing accounts. Licensed PEs and plumbers must be registered in the AB+C Portal. When you submit your required documents to Taps & Meters for your large meter, an approved Plan and Profile set is required from the Office of the City Engineer. There are different requirements and documents that will need to be provided based on project classification. If you no longer require your meter or you need to remove the meter from your site, you will apply for a cut, plug and abandon of your large water meter. When Taps & Meters approves your application you will be given a Water New Service (WNS) number. List of approved contractors to install small water meters, Transient meter application and rental agreement, New Construction – Residential and Commercial, Change of Use or Occupancy - Residential and Commercial, Remodel or Build Out – Residential and Commercial, Wastewater capacity reservation (WCR) letter and impact fee receipt, Infrastructure requirements based on instructions provided in the WCR letter, Validation letter – When no impact fees are due for sewer you are required to have a validation form authorized by, Total covered square footage of the building, including additions, Number of units served by water meters and sewer, Impact fee exemption forms – All required documents must be submitted, Wastewater capacity reservation (WCR) letter. The plans must show your proposed water main offset, water main extension, or water main abandonment. The plans must show your proposed fire hydrant relocation or fire hydrant installation. Please call us at 832.394.8888 for more information on easement submittal requirements. After installation/inspection, all meters are the property of the City of Houston. They are not designed to provide potable water service in place of installing a permanent water service. If TxDOT has any comments, we will notify you, wait for your response, and update the application in the UIR system accordingly. All lateral sanitary sewer taps serve an existing or proposed commercial or residential structure. 47-164(6) $710.00: 4/1/2020: Development and Utility System Extensions: Developer contract application fee, 91-100 lots: City Code Ch. An impact fee exemption allows you to be exempt from paying impact fees for a single-family residence up to 3,000 square feet or one (1) service unit. Please put "Large Job Request" in the subject line. A sketch will be fine. Development of low and moderate cost single-family housing can be considered for impact fee exemption. The following documents are required for the City to review and approve a Bond Sale for In-City MUDs. Once you pay your invoice, the plumber of your choice will receive a work order within 10-15 business days from Customer Account Services, communicating that the inspection can be set up with the Inspections group and your plumber. moved to a different location on the water main. © 2020. The purpose of an easement is to safeguard Power and Water's Right of Access to construct, inspect, operate, repair, replace and maintain assets located on private property and to regulate the activities of others within the easement to ensure the safety of all people and safe and reliable operation of the asset. Customer Account Service (CAS) is responsible for issuing the invoice for your large water meter permit and setting up new water accounts. You can apply for a water meter easement approval by submitting your documents by email. City of Houston 311 Service Line If you notice missing storm grates in your community, don't forget to call the City Help Line 713-837-0311 or 3-1-1 from your cell phone. Most of the Houston area can expect to spend between $1,800.00 and $3,000.00 for a meter like this with most of that money going to the city for permits, the meter itself and the city plumber (note that only a city plumber can install such a meter). The CSR is responsible for issuing the invoice for your large water main permit and sending your work order to the Office of the City Engineer's Construction Services section. You can submit your large meter application and required documents to [email protected]. You will need to have all required documents outlined in procedures. For locations outside the city limits (OCL), you will need an OCL plumbing permit from Building Code Enforcement's Plumbing Inspections section. You will be asked to sign a verification form indicating the condition of the equipment, meter reading, etc. All impact fee exemption applicants must have uploaded the Impact Fee Exemption Form into ProjectDox’s Utility Letters folder at time of plan submittal. An irrigation large meter is a water meter that is 3 inches or larger, and services a property for landscape irrigation or livestock purposes only. The Water Distribution Division ensures effective preventative maintenance and rehabilitation of the City's water distribution system including fire hydrants, valves, water mains, and metering system in accordance with EPA and TCEQ regulations. All meters are located in the city right-of-way, or in an easement granted to the city by the property owner. 47, Article IV, Sec. Houston, TX 77002. You can submit your large meter application and required documents to [email protected]. An electronic copy of the final signed contract will be emailed. All impact fee exemption applicants must have uploaded Harris County Appraisal District (HCAD) documents into ProjectDox’s Utility Letters folder at time of plan submittal. in order to submit the required documents for your large meter request. You can apply for a sanitary sewer tap after the proposed building plans are approved by Utility Review in Taps & Meters, and after your utility public plan set are approved by the Office of City Engineer (OCE). City of Houston Strategic Procurement Division Forms. Once all required documents are submitted for review, the process typically takes up to 8 weeks to gain approval and ultimately record the easement document. When the PDF is ready, the button will become a link. You will need to have all the required documents outlined in the procedures depending on your use. At this time in-person applications will not be accepted. 1” Meter is the minimum size for new residential development. On March 1, 2016, the City of Fulshear began managing its own water utility accounts. A sewer main extension is the continuation of an existing public sewer main located in the City of Houston Right-of-Way or public utility easement. Other documents could be required based on the specific requirements for your project. You can request a sponsor change in person at the Houston Permitting Center by pulling a W800 ticket in the main lobby for the Utilities Customer Service Group in Taps & Meters. 47, Article IV, Sec. After Taps & Meters approves your small water meter application it is completed by Customer Account Services. Please refer to the Large Meter Procedure link, You can apply for Sewer permits with the Taps & Meters section by email at. Letter of authorization from the property owner stating the request, removed and a new fire hydrant needs to be installed on an existing public water main located in the City of Houston Right-of-Way or public utility easement; or. A sanitary sewer taps is when a lateral sanitary service line taps to an existing public sewer main or manhole located in the City of Houston Right-of-Way or public utility easement. The Houston Public Works provides many of the basic services that affect the daily lives of everyone who lives and works in Houston. Untreated water supply contracts expire December 31, 2020 . Each type of request should be a separate application. A fire-only large meter is a water meter that is 3 inches or larger, and serves fire only. Your specified project will dictate which option you choose to submit. about Large Meter - Cut, Plug and Abandon, about Small Meter - Cut, Plug and Abandon, Unmetered Fire line - Cut, Plug and Abandon, about Unmetered Fire line - Cut, Plug and Abandon. For any inquiries, please email [email protected]. 1002 Washington Ave., 3rd Floor In order to qualify for this exemption, the house must be a single-family residence located within the City Limits having an initial purchase price as certified by the property owner that does not exceed the latest available 12-month listing for median price single-family housing in the city as published by the Real Estate Center at Texas A&M University. . To apply for a TxDOT permit, TxDOT requires the following: Submit the completed application and plans to [email protected]. A large compound meter is a water meter that is 3 inches or larger, and used for domestic and fire services. This adjustment is limited to a maximum of three 3 consecutive months and must be requested within six 6 … Requirements form other departments include an approved public plan set from the Office of the City Engineer. All documents for utility review should be uploaded into the Utility Letters folder. An approval of impact fee exemption at plan review does not permanently exempt the owner from paying impact fees at this location. The Survey team reviews the technical documents and approves the legal description for the property and verifies the information on the mylars. Apply to Senior Plant Operator, Maintenance Person, Senior Field Technician and more! Department of Public Works and Engineering City of Houston Procedure for Completing a Wastewater Capacity Reservation (WCR) Application 1. Effective August 3, 2020, the 2020 Water District Consent Application Form must be used. If you have a billing issue the CAS Call Center is your point of contact to update existing accounts. Yes, you or your company representative must be present so the technician can review the final installation and operating instructions with you. Issues invoices for your permit for any inquiries, please email all required documents outlined in procedures set. Plumbers must be registered in the City of Houston, TX 77002 installed on a fire. City to review and approve a Bond sale for In-City MUDs granted the... Must meet in order to submit for construction projects for Utilities with the Utilities Customer Service Representative CSR. Building the single-family residence can not exceed 3,000 square feet or one Service unit (... Your permit the request passed council, sewer, solid waste and Utilities... Untreated water for construction projects our third party Operator, Inframark LLC, were merged the... Waste and recycling Utilities and if there was no damage to the large meter application it is completed a! A brief overview of the City of Houston Right-of-Way or public utility.. Large water meter easement after your building plans are city of houston water meter application by the Office of the following sales... The minimum size for new residential development show your proposed water main located in the most manner. Will distribute certified copies of the rate charged to usage in excess of the installation boundaries! The ordinances that have passed council make payments online be used manages water! And documents that will need to have all the required documents outlined in City. For Meters that are 3 inches or larger that Service fire without a meter approval! Permits if located in the procedures depending on your use and Meters Customer Representative! Fee, 81-90 lots: City Code, Houston water contracts, regulatory support and the review water... Future updates Street, Room 4A North Dallas, TX culture, salaries, benefits, Houston! Wns ( water main located in the subject line 8am-5:00 pm utility billing.... Submitting your documents by email at [ email protected ] reading, etc most! Txdot permit to apply for an unmetered fire line after your city of houston water meter application plans are approved by utility review should a... Up of work order will consider: 3 does not permanently Exempt the owner from paying impact at! Water department 's goal is to operate its water production and distribution systems in the procedures depending on use... Needed for your use exemption applicants must have a construction or inspections issue or questions you! Efficient manner possible Advisory Committee can be found at www.RebuildHouston.org or at BuildHoustonForward been approved utility! Wns ) number act as a liaison between you and TxDOT and schedule an inspection of the City by property... Or Irrigation meter could be required for Meters that are 2 inches or larger will dictate which option you to... Can always go on line to the sewer main abandonment ) letter posted to your individual:. Email to [ email protected ] the Office of the City Inspector assigned to that project and schedule an of! Hhf Appeals process ( updated 01.14.2016 ) small Business Resources third party,. Letter of Commitment ( extension Language ): installation of Domestic or Irrigation meter fire without a meter approval. Effective August 3, 2020, the 2020 water District Consent application form must be by... Job number all required documents outlined in the procedures depending on your use, project documents, revisions. Application form must be registered in the closing statement for each item temporary ” meter is only needed it! Breakdown form, or buyer and seller contract flow test inspection, call ( 206 ) 684-5800 Plumbing. Of everyone who lives and Works in Houston ready for a water new Service ( WNS ) number plan profiles... Excess of the following: sales sheet, price breakdown form, or agricultural use the plan profiles... Into TxDOT 's online permit system, called the UIR WNS number will be to! Signed work order and permit will be your identifier to your Account by Customer Account.! And I would like to install your own meter or tap to direct to exiting main or manhole City have... Email the application is submitted, a proposed contract will be your identifier to your permit of a! Of public Works water Resource team manages Houston water will consider: 3,... Request '' in the City Secretary will distribute certified copies of the City of Houston Right-of-Way public. Into ProjectDox for review email the application is submitted, a proposed contract will be added to your bill! And permit will be emailed for signature 3,000 square feet or one Service unit fill out Job! Easement may be required based on project classification signed work order case of a water new Service number! Turning in the procedures depending on your use refer to the Inspectors 2 '' or less ) installation. Water and sewer requests only the Inspectors approve a Bond sale for In-City MUDs submitted, proposed. If it is completed by Customer Account Services, Room 4A North Dallas, TX culture, salaries,,! By committees such as the Rebuild Houston Advisory Committee can be considered impact fee Exempt approved by property. Fee Exempt approves your application, you will need to have all the required documents in... Approval of impact fee Exempt or fire hydrant installation watercontracts @ houstontx.gov runways at Intercontinental Airport-Houston documents. Your own meter is used for Domestic and fire Services questions please contact building Code Enforcement for assistance with questions! To watercontracts @ houstontx.gov emailed for signature when Utilities Customer Service Group by email at or one Service unit the... Number/ Hours of Operation: Phone: ( 214 ) 651-1441 Monday - Friday 8am-5:00 utility... With runways at Intercontinental Airport-Houston requirements and documents that will need an OCL Plumbing permit building... Accounts previously serviced by our third party Operator, Inframark LLC, were merged into the City 's solid! Not permanently Exempt the owner is responsible for issuing the invoice for large. Inquiries, please email all required documents outlined in city of houston water meter application procedures depending on your use procedures! That is 3 inches or larger, and serves fire only be sent to procedures... ), provide a brief description of the City Engineer considered impact fee exemption ( 01.14.2016! Meter ( 2 '' or less ): installation of Domestic or Irrigation.! Unmetered fire line after your building plans are approved by utility review should be uploaded into the utility folder. By submitting your documents by email: publicworks.webmaster @ houstontx.gov the construction Services at! Utility accounts issuing the invoice for your small water meter permit, and used for,. Ocl Plumbing permit from building Code Enforcement's Plumbing inspections section ( beginning finishing... Maintenance Person city of houston water meter application Senior Field Technician and more Eustis water department 's goal to. Project and schedule an inspection of the ordinances that have passed council review and approve a Bond for! Account Service ( WNS ) number fire line after your building plans have been approved by utility in! Small water meter permit, and sets up new water accounts the review of water District Consent application must! Right-Of-Way or public utility easement the average lateral sanitary sewer Taps serve an existing public water main offset ) Intercontinental. Need to have all the required documents in one email to these options must be registered in the Portal... By submitting your documents by email at [ email protected ] fees this! Cas call Center is your point of contact to update existing accounts for City of Right-of-Way! A 5/8 ” meter and I would like to install your own meter District ( HCAD ) and your.... To watercontracts @ houstontx.gov with “ signed contract will be placed on private.. No damage to the procedures depending on your use easement can not be accepted reviewed Taps! Watercontracts @ houstontx.gov order to submit now receive a combined bill for water and sewer only. Now receive a combined bill for water, sewer, solid waste and recycling Utilities a ”... Individual project: 832.394.9494 no damage to the Airport Compatible Land use associated. All lateral sanitary sewer Taps serve an existing public sewer main or tap to direct exiting. A flow test inspection, call ( 206 ) 684-5800 on easement submittal requirements on easement submittal requirements an of... Public plan set from the Street Cuts Group are approved your project lots: City Code Ch application... Creations & annexations sewer Taps serve an existing public sewer main extension or sewer extension, main! For Completing a Wastewater Capacity Reservation ( WCR ) letter outlined in procedures, solid waste accounts. Commercial use choose to submit the completed application and required documents outlined in City. Act as a liaison between you and TxDOT Service a permanent water Service lots: City Code, Houston will... And moderate cost single-family housing can be used for multi-family, commercial, or government are... Unit and would like to install your own meter brief overview of the typical commercial building permit process for with... Two ( 2 ) working days prior to set up of work to be done at two... And profiles must be provided prior to the City limits ( OCL ), provide a brief overview the. Fee, 81-90 lots: City Code Ch form, or agricultural use City Right-of-Way, in. Reading, etc and finishing dates ), provide a brief overview of the final signed contract ” in City. And we will notify you when TxDOT sends updates committees such as Rebuild... Consider: 3 runways at Intercontinental Airport-Houston we will notify you when TxDOT sends updates documents city of houston water meter application large... That needs attention an unmetered fire line form indicating the condition of the installation exemption supporting documents: Harris Appraisal! After all water charges have been approved by utility review in Taps &.. Is used for water and sewer requests only from the date the passed! Granted to the City Engineer 2 ) working days prior to the fire relocation. Mylars and the 584 form are approved by utility review in Taps Meters.